Dear David and Robin,
Thank you for the opportunity to provide you with our opinion of probable cost for the project at 543 The Panorama, Tallai.
This proposal includes items set out in the documents supplied. The documents are as follows:
- 260619 - 543 The Panorama, Tallai - Project Scoping Document
- 260619 - 543 The Panorama, Tallai - Costing Issue
- Geotech Report
- 543 The Panorama - Bushfire Report
- 543 The Panorama - Septic Design [ASI_260259-ABS]
- 543 The Panorama - Contour & Detail [Survey 25245-D1-A-(A0)]
This is the headline scorecard: the client's key questions and your one-line answers. Add each question/answer as a .qa-row inside the .qa block above (template shown in the comment there). Delete this note once you've added rows.
Opinion of Probable Cost.
We would commit to a 396 working day construction program: 18 working months, start to finish.
- Demolition.
- Tree removal.
- External tree management.
- Rock removal.
- Working with or the removal of contaminated material or other latent in-ground conditions.
- Blinding concrete.
- Any works outside of the title boundary, including upgrading sewer, gas, power, water, or associated works (inclusive of trenching etc).
- All connection fees (phone, gas, electrical and water).
- All consultant fees associated with the project.
- Authority fees such as council bonds / asset protection / tree protection etc.
- Soft landscaping & irrigation.
- Leaf guard.
- Roof safety system and ladder.
- Lift.
- EV charging.
- Automation and AV.
- Indoor recreational items.
- Any upholstery, rug or loose furniture.
Comparison to Early Concept.
| Description | Early Concept | Schematic Design | Rate | Early Concept Pricing | Schematic Design Pricing |
|---|---|---|---|---|---|
| Internal Finished Area (sq m) | 551.73 | 570.70 | $10,000 | $5,517,300 | $5,707,000 |
| Garage, Workshop and Services (sq m) | 73.76 | 214.78 | $6,000 | $442,560 | $1,288,680 |
| Driveway (sq m) | 182.68 | 319.23 | $1,000 | $182,680 | $319,230 |
| Externally Finished Area (sq m) | 67.54 | 76.34 | $3,000 | $202,620 | $229,020 |
| Externally Enclosed Area (sq m) | 102.49 | 199.25 | $6,000 | $614,940 | $1,195,500 |
| Planters (sq m) | 9.75 | 75.33 | $6,000 | $58,500 | $451,980 |
| Spa inc Heater | - | - | $55,000 | ||
| External Works and Hardscape only | $500,000 | $300,000 | |||
| Totals | 987.95 | 1,455.63 | $7,518,600 | $9,546,410 |
Early Concept vs Schematic Design.
Case Studies.
1. Photos: drop image sets into assets/ named cs1-1.jpg, cs1-2.jpg … (one prefix per study).
2. Markup: copy the .proj block from the comment below for each study: set the title, point the <img> sources at your files, and write the narrative in .proj-copy.
Missing photos self-hide, so a half-built carousel still looks clean. Delete this note when your studies are in.
W.Mermaid - Local Completed Work of Same Value Case Study
A stunning north-facing waterfront home on the Gold Coast, completed two months ahead of program with a subcontractor base we assembled from scratch in another state.
W.Hedges - Gold Coast Shaun Lockyer Architect Live Project Case Study
Another Shaun Lockyer Architects project in the region, under construction on Mermaid Beach today: a striking three-level home with a double-storey basement and a similar off-form concrete finish to 543 The Panorama. We are familiar with SLA's details and finishes, and we are building them right now.
W.Alpine - Off Grid Regional Project Case Study
Set amongst the wild beauty of the Victorian Alps: a remote, steeply sloping site at the end of a 25 km track, in the highest-rated bushfire zone. The land led every decision: a structure settled gently into the fall of the country among the native trees, detailed and built to the standard the bushfire rating demands. The majority of contractors were local trades we worked with for the first time; where the regional market could not service a need, we brought specialists in from Melbourne.
The Project Team.
A dedicated project team, provided from start to finish.
- Shop drawing review
- Waterproofing details
- Safety
- Setouts
- Quality management
- Trade bookings
- Drawing execution
- Contract program
- Head contract
- Design resolution
- Critical details
- Client communications
- Meeting agenda
- Project operating system
- Client experience
- Project budget
- Trade procurement
- Subcontract management
- Insurances
- Variations
- Document control
- RFIs
Every member of the team carries experience in $10M+ single-dwelling construction.
The resources will be allocated to the project and details will be provided for each position once timeline and preferred status are realised.
A list of key subcontractors will also be provided alongside cost plan proposal, construction program and 3D construction methodology within three weeks when we progress to the next stage.
Detailed Proposal Example Upon Preferred Status
A detailed proposal including 3D construction program and methodology as well as key trade recommendations can be prepared within four weeks when we're engaged as the preferred builder.
3D Program and Methodology.
Provided with our detailed pricing submission.
Fixed Price Trade Recommendation.
Provided with our detailed pricing submission.
One Promise. True Alignment.
Our interests and our client's interests are aligned across every dimension of the project.
Together We Reclaim Time.
Every build is programmed to the day against a live schedule our clients can see. Our fee is fixed. We have no incentive to extend and every reason to deliver early.
Together We Protect Cost.
Every cost is competitively tendered, benchmarked against market, and filtered through a trained financial model fine-tuned on a decade of commercial data. Our fee is fixed against a defined scope. Every dollar saved on trades protects the client's cost and our margin.
Together We Perfect Quality.
Defect-free at handover. No leaks. No unfinished work. Every stage inspected and documented against a quality system defined by national exposure and supported by the most cutting edge construction technology stack available. Our reputation is our pipeline.
Together We Elevate the Experience.
Live site cameras streaming to your device, a private daily feed of progress and milestones, one dedicated app for all communication, documents, data, and your W. team. A build with no blind spots is a build with fewer queries to answer. Transparency serves both sides.
W. Portfolio.
Beyond the case studies: more of the homes we've delivered, and the live projects under construction today.
The portfolio is a reusable set of W. projects, curated per EOI. Photos come from the W. media library / w.build/in-practice (see the wbuild-asset-sourcing skill); drop selects into assets/ named pf-<slug>-1.jpg, pf-<slug>-2.jpg ….
Markup: copy one .proj block from the comment below under each subheading. Keep the two subheads Completed Works. and Under Construction. (accent gold). Progress shots belong only under Under Construction.
Completed Works.
W.SOUTH YARRA
A basement + three-storey restoration and extension of a grand heritage mansion, including an 11-car basement: tunnelling beneath the existing house.
W.HOPETOUN
A four-level, cantilevered off-form concrete residence overlooking the city, delivered early on an $11M fixed price.
W.LAMBETH
A meticulous restoration and extension of an early Edwardian home, blending classic and contemporary craftsmanship into a timeless luxury residence.
W.CANTERBURY
A sophisticated Victorian terrace renovation, built while we delivered the same client's dream home in Queensland. Only possible with W.
W.EUROMA
A masterful restoration and extension of a Victorian-era Hawthorn brick villa, its original character thoughtfully preserved, with modern living layered through every room.
Under Construction.
W.AQUA
A breath-taking three-level residence with basement, showcasing expansive off-form concrete walls, soaring five-metre sliding windows and three luxurious pools.
W.HAMBLETON
An exquisite restoration and contemporary evolution of a heritage residence: refined Victorian craftsmanship, sophisticated modern additions and a luxurious new basement level.
W.ESPLANADE
A distinctive new build on Brighton's Esplanade, defined by sweeping sculptural forms and bold, panoramic double-height glazing that commands the beachfront.
W.MARINE PARADE
Our first Western Australian chapter: a new home for Swanbourne on Perth's coast, with details to come.
Business Details.
Company details
Southbank VIC 3006
Insurance.
Certificates of currency are available immediately on request.
References.
Photos: a card-ratio (~1.68:1) thumbnail per referee at assets/ref-1.jpg etc. Format each card: Name | Designation in bold (designations are Architect or Client, never "Director"), firm/location on line two, then projects, email, phone in 04XX XXX XXX format.
Copy the card block from the comment below, one per referee.
The Technology Stack.
W.App
Everything on a W. project runs through W.App: workflows and approvals, documents, live site cameras, the 3D model, project intelligence and every conversation with your W. team, in your pocket, every day.
Starlink-connected site cameras give our clients full 24/7 transparency, with no blind spots, beside a private social feed exclusive to the client and the project management team. Every W. site runs the same stack:
Walk through a W. scan.
Below is an interactive 3D scan of a W. Project under construction. These scans are completed at key stages of the build and shared with everyone involved for transparency.
Set PROJECT.matterport to a Matterport share URL to embed an interactive 3D scan here. Leave it empty to hide the embed entirely.